TRACK RECORD

Subsea Fibre Optic Cable

REGION

Offshore, North West Poland

SECTOR

Oil & Gas

SOLUTIONS

Controlled Flow Excavation

The Project

JBS were contracted by Logi Point Polska to provide Sea Axe CFE equipment and operational team members for a project offshore Swinoujscie, North West Poland. JBS were contracted to locate a subsea fibre optic cable and then excavate the area to allow cable repairs to be completed. Water depth was 20 metres, and the equipment was deployed from the vessel Baltic Worker.

 

The Challenge

The fibre optic cable had very small diameter of 22mm, burial depth 3m with “as laid” survey data dating back to 1989. Client initially requested the JBS Sea Axe team to create a 3.2m deep x 16m wide trench over a 100m length. Bottom of trench width was 4.56m. Trench still had soft backfill so it was decided to increase the trench width at port and starboard side to approximately 20m wide at the top of trench. Sea Axe then went back to centre area and continued to excavate at “as laid” area.

 

The Solution

JBS Sea Axe team located the cable, completed the excavation to allow for diver access and cable repair. Project completed successfully and client delighted with the performance.

Subsea fibre optic cable

Want to know more?

Connect with us

Marine & Subsea

JBS delivers specialised engineering for deployment in marine and subsea environments — from precision controlled flow excavation (CFE) work on the seabed to delivering bespoke fabrication work for installation below the surface. 

With headquarters in the North Sea port of Peterhead, our team are perfectly placed to support Marine & Subsea clients in the North Sea and other global regions,.

Rig tool